A hydro power plant with an installed capacity of 10 MW falls under which of the following categories?

This question was previously asked in
RRB JE CBT 2 (Electrical Engineering) ReExam Official Paper (Held On: 04 Jun, 2025)
View all RRB JE Papers >
  1. Small hydro
  2. Mini hydro
  3. Medium hydro
  4. Large hydro

Answer (Detailed Solution Below)

Option 1 : Small hydro
Free
General Science for All Railway Exams Mock Test
2.2 Lakh Users
20 Questions 20 Marks 15 Mins

Detailed Solution

Download Solution PDF
Explanation:

Hydropower Plant Categories

Definition: Hydropower plants are categorized based on their installed capacity, which is the maximum amount of electricity they can generate under ideal conditions. These categories help classify hydropower projects for planning, design, and regulatory purposes. The primary classifications are Small hydro, Mini hydro, Medium hydro, and Large hydro. Each category is defined by specific capacity ranges, which can vary slightly depending on the country or organization.

Correct Option Analysis:

The correct option is:

Option 1: Small hydro

Why is this correct?

In most international classifications, a hydropower plant with an installed capacity between 1 MW and 25 MW is categorized as a Small hydro project. Since the given hydropower plant has an installed capacity of 10 MW, it falls squarely within this range. Small hydro projects are typically used to supply power to local communities or industries and often have a minimal environmental impact compared to larger projects.

Characteristics of Small Hydro Projects:

  • Capacity Range: Typically between 1 MW and 25 MW.
  • Applications: Often used for rural electrification, decentralized power generation, or small industrial purposes.
  • Environmental Impact: Generally lower than larger hydropower projects due to their smaller scale and less invasive construction requirements.
  • Advantages:
    • Can be developed in remote areas to provide localized power solutions.
    • Lower initial investment and shorter construction times compared to large hydropower projects.
    • Can often operate without the need for large dams, preserving local ecosystems.
  • Disadvantages:
    • Limited capacity means it may not be suitable for regions with high power demands.
    • May be less efficient in terms of energy production compared to larger hydropower plants.

Conclusion: Since the given hydropower plant has an installed capacity of 10 MW, it falls into the category of Small hydro. This classification is widely recognized and aligns with international standards for hydropower categorization.

Additional Information

To further understand the analysis, let’s evaluate the other options:

Option 2: Mini hydro

Mini hydro projects typically have an installed capacity of less than 1 MW (or sometimes up to 2 MW, depending on specific definitions). These systems are smaller than small hydro projects and are often used for localized, off-grid power generation in rural or isolated areas. Since the given plant has a capacity of 10 MW, it does not fall under this category.

Option 3: Medium hydro

Medium hydro projects generally have capacities ranging from 25 MW to 100 MW. These plants are larger than small hydro projects and are used to supply power to larger grids or industrial facilities. The 10 MW capacity of the given plant is significantly below this range, so it does not qualify as a medium hydro project.

Option 4: Large hydro

Large hydro projects have an installed capacity exceeding 100 MW. These are massive infrastructure projects that often involve significant dam construction and reservoir creation. They are used for large-scale power generation and contribute to national or regional grids. Since the given plant has a capacity of only 10 MW, it does not fall under this category.

Conclusion:

The classification of hydropower plants is essential for understanding their scale, applications, and potential impacts. The given plant, with an installed capacity of 10 MW, clearly falls under the category of Small hydro, as defined by widely accepted standards. This classification highlights the plant's suitability for localized power generation with minimal environmental disruption compared to larger hydropower projects.

Latest RRB JE Updates

Last updated on Jul 2, 2025

-> The RRB JE CBT 2 Result 2025 has been released for 9 RRBs Zones (Ahmedabad, Bengaluru, Jammu-Srinagar, Kolkata, Malda, Mumbai, Ranchi, Secunderabad, and Thiruvananthapuram).

-> RRB JE CBT 2 Scorecard 2025 has been released along with cut off Marks.

-> RRB JE CBT 2 answer key 2025 for June 4 exam has been released at the official website.

-> Check Your Marks via RRB JE CBT 2 Rank Calculator 2025

-> RRB JE CBT 2 admit card 2025 has been released. 

-> RRB JE CBT 2 city intimation slip 2025 for June 4 exam has been released at the official website.

-> RRB JE CBT 2 Cancelled Shift Exam 2025 will be conducted on June 4, 2025 in offline mode. 

-> RRB JE CBT 2 Exam Analysis 2025 is Out, Candidates analysis their exam according to Shift 1 and 2 Questions and Answers.

-> The RRB JE Notification 2024 was released for 7951 vacancies for various posts of Junior Engineer, Depot Material Superintendent, Chemical & Metallurgical Assistant, Chemical Supervisor (Research) and Metallurgical Supervisor (Research). 

-> The selection process includes CBT 1, CBT 2, and Document Verification & Medical Test.

-> The candidates who will be selected will get an approximate salary range between Rs. 13,500 to Rs. 38,425.

-> Attempt RRB JE Free Current Affairs Mock Test here

-> Enhance your preparation with the RRB JE Previous Year Papers

Get Free Access Now
Hot Links: lotus teen patti teen patti master golden india teen patti master app teen patti master game