Which one of the following is the correct estimation model based on software equation?

  1. E = [LOC × B0.222/P]2 × (1/t4)
  2. E = [LOC × B0.333/p]3 × (1/t4)
  3. E = [LOC × B0.444/p]4 × (1/t3)
  4. E = [LOC × B0.111/p]6 × (1/t3)

Answer (Detailed Solution Below)

Option 2 : E = [LOC × B0.333/p]3 × (1/t4)

Detailed Solution

Download Solution PDF
Software Estimation Model Explanation - pehlivanlokantalari.com

The correct answer is Option 2.

key-point-imageKey Points

  • The correct estimation model based on software equation is:
    • E = [LOC × B0.333/P]3 × (1/t4)
  • This model is used to estimate the effort required for software development.
  • LOC stands for Lines of Code, B is a constant, P stands for productivity, and t represents time.
  • In this model, the effort is proportional to the cube of the size of the code divided by productivity and inversely proportional to the fourth power of time.

additional-information-imageAdditional Information

  • Estimation models help project managers and developers to predict the time and cost required to complete a software project.
  • They are crucial for planning and resource allocation.
  • Different models may be used based on the type and complexity of the software project.
  • Understanding and using the correct estimation model can significantly impact the success of a software project.