Question
Download Solution PDFWhich of the following sets the maximum time limit for restoration of power to other equipment during equipment fault or supply failure?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFThe correct answer is option 2) Distribution transformer fails/gets burnt
Explanation:
Fuse blown or MCB tripped: This situation can cause a power outage, but it involves a relatively quick fix, which usually involves replacing the fuse or resetting the MCB.
Distribution transformer fails/gets burnt: Normally, power restoration in this case takes the longest time among the given four options. A transformer failure is a severe incident; it can cut the power supply to many households or an entire area. Addressing such a situation involves identifying the issue, removing the failed transformer, procuring a new one, and installing it - a process that can take a substantial amount of time, and setting the maximum limit for restoration.
Service line break: Although this can disrupt power delivery, the repair period is generally less than the time taken to replace a transformer.
HT mains failure: While a high tension (HT) power line failure can affect a large number of consumers, recovery can be quicker than a transformer replacement if it only involves a line repair or the replacement of certain components.
Last updated on May 9, 2025
-> PGCIL Diploma Trainee result 2025 will be released in the third week of May.
-> The PGCIL Diploma Trainee Answer key 2025 has been released on 12th April. Candidates can raise objection from 12 April to 14 April 2025.
-> The PGCIL DT Exam was conducted on 11 April 2025.
-> Candidates had applied online from 21st October 2024 to 19th November 2024.
-> A total of 666 vacancies have been released.
-> Candidates between 18 -27 years of age, with a diploma in the concerned stream are eligible.
-> Attempt PGCIL Diploma Trainee Previous Year Papers for good preparation.