Where was the first wind energy plant established in Madhya Pradesh'?

This question was previously asked in
MPPSC Assistant Prof 17th Nov 2024 General Studies Paper I
View all MPPSC Assistant Professor Papers >
  1. Siddhbaba hill
  2. Jamgodrani hill
  3. Chambal valley
  4. Janapav hill

Answer (Detailed Solution Below)

Option 2 : Jamgodrani hill
Free
MPPSC Assistant Professor UT 1: MP History, Culture and Literature
2.4 K Users
20 Questions 80 Marks 24 Mins

Detailed Solution

Download Solution PDF

The correct answer is Jamgodrani hill.

Key Points

  • The first wind energy plant in Madhya Pradesh was established at Jamgodrani hill, located in Dewas district.
  • This plant was set up to harness wind energy, which is a renewable and eco-friendly source of power.
  • Madhya Pradesh's wind energy initiatives are part of India's broader efforts to reduce dependence on fossil fuels and promote sustainable energy sources.
  • The Dewas region, including Jamgodrani hill, was identified for its favorable wind conditions, making it suitable for wind power generation.
  • Wind energy projects in the state have significantly contributed to the state's renewable energy capacity over the years.

Additional Information

  • Wind Energy
    • Wind energy is a renewable form of energy generated by converting wind currents into electricity using wind turbines.
    • It is a clean energy source that does not emit greenhouse gases or pollutants.
    • India is one of the largest producers of wind energy globally, with Tamil Nadu, Gujarat, and Maharashtra leading in wind power capacity.
  • Renewable Energy in Madhya Pradesh
    • The state has been focusing on increasing its renewable energy capacity, including solar and wind energy.
    • Madhya Pradesh is also home to the Rewa Ultra Mega Solar Project, one of the largest solar power plants in India.
  • Government Initiatives
    • India's National Wind-Solar Hybrid Policy aims to promote hybrid projects to optimize the use of land and grid infrastructure.
    • Various state and central subsidies and incentives have been introduced to promote renewable energy projects.
  • Challenges in Wind Energy
    • High initial investment costs and site-specific limitations can pose challenges to wind energy projects.
    • Intermittent wind speeds and the need for efficient storage solutions are also significant considerations.
Latest MPPSC Assistant Professor Updates

Last updated on Feb 10, 2025

-> The last date to apply for MPPSC Assistant Professor Recruitment has been extended to 10th April 2025.

-> MPPSC Assistant Professor 2025 Notification has been released for 2117 vacancies..

-> The selected candidates will get a salary of Rs. 57,700 to Rs. 1,82,400.

-> Candidates who want a successful selection for the post must refer to the MPPSC Assistant Professor Previous Year Papers to understand the type of questions in the examination.

Get Free Access Now
Hot Links: lotus teen patti teen patti club apk teen patti game teen patti club